CORPORATE
AESOP OFFICE

AESOP OFFICE

Interior

Office

Area
317.00 ㎡

Date
2015.08–2015.12

Location
3, Seolleung-ro 162-gil, Gangnam-gu, Seoul, Korea
SAMPYO HWASEONG INTEGRATION OFFICE

SAMPYO HWASEONG INTEGRATION OFFICE

New Construction Office Area 2113.94㎡ Date 2013.01–2015.02 Location 738-4,5 Yangno-ri bibong-myeon hwaseong-si, gyeonggi-do, Korea             Project Design Eulho Suh Project Team Sindoo Kang, Jinwoo Kim, Chilhyun Lim, Jinwoo Park, Kwangchul Byun, Serim Hur, Jihoon Jeon, Gayoung Yoon, Sejin Choi   Furniture Design Suh Architects Graphic...
SPKOREA OFFICE

SPKOREA OFFICE

Interior Office Area 450.00㎡ Date 2013.03–2013.06 Location 98, Hannam-daero, Yongsan-gu, Seoul, Korea     Project Design Eulho Suh Project Team Hwayoung Jung, Yujin Oh   Furniture Design Suh Architects   Photography Kyungsub Shin  
S OFFICE_ STATE TOWER

S OFFICE_ STATE TOWER

Interior Office, Lounge Area 4000.00㎡ Date 2012.07–2012.10 Location 19-7, Toegye-ro 14-gil, Jung-gu, Seoul, Korea       Project Design Eulho Suh Project Team Hwayoung Jung, Seokji Jeon   Furniture Design Suh Architects Graphic Design Suh Architects   Photography Guru Visual, Inc. Jongkeun Lee  
ANAM ELECTRONICS SAMSEONG-DONG OFFICE

ANAM ELECTRONICS SAMSEONG-DONG OFFICE

Interior Office, Showroom, Lounge Area600.00㎡ Date2012.01–2012.10 Location616, Yeongdong-daero, Gangnam-gu, Seoul     Project DesignEulho Suh Project TeamHwayoung Jung, Bori Lee   Furniture DesignSuh Architects Graphic DesignSuh Architects ConstructionCity Architects   Motion DesignImage Bakery PhotographyKyungsub Shin  
HYUNDAI MOTOR GROUP UNIVERSITY MABUK CAMPUS

HYUNDAI MOTOR GROUP UNIVERSITY MABUK CAMPUS

Renovation Dormitory, Lecture rooms, Auditorium, Lounge, Fitness Center, Soccer field, Basketball courts Area 37,529.95㎡ Date 2010.1–2012.4 Location 17-4, Mabuk-ro 240beon-gil, Giheung-gu, Yongin-si, Gyeonggi-do, Korea Despite its former natural context, the Hyundai’s Mabuk Education and Training Center was once a dimly-lit, somber monolith that showed no awareness of the beauty surrounding...
SHINSEGAE HEADQUARTERS OFFICE

SHINSEGAE HEADQUARTERS OFFICE

Interior Office Area 1,430.00㎡ Date 2011.02–2011.09 Location 77, Toegye-ro, Jung-gu, Seoul, Korea     Project Design Eulho Suh Project Team Hwayoung Jung   Furniture Design Suh Architects Lighting Consultant Hwang-Duck Photography Guru Visual,Inc._Jongkeun Lee      
DAEWOONG DMD CONVENTION CENTER

DAEWOONG DMD CONVENTION CENTER

New Construction Convention Center, Cafeteria, Auditorium Area 16,843.35㎡ Date 2009.04–2011.09 Location 72, Dugye-ro, Pogok-eup, Cheoin-gu, Yongin-si, Gyeonggi-do, Korea         Project Design Eulho Suh Project Team Insoo Cho, Dongsoo Park, Yongji An, Shani Cho   Construction Posco A&C Structural Engineer Alim Structure       3D Rendering Crystal_CG Photography...
MAEIL DAIRY GWANGJU FACTORY & OFFICE

MAEIL DAIRY GWANGJU FACTORY & OFFICE

Renovation Production and Visitor Center & Office Area 5,346.48㎡ Date 2008.5–2009.12 Location 511, Eodeung-daero, Gwangsan-gu, Gwangju, Korea     Project Design Eulho Suh Project Team Youngsoo Kim, Jwakyum Kim   Construction Doole Architect Structural Engineer Shindosi Architects Lighting Consultant Suh Architects Furniture Design Suh Architects   Graphic Design Twoplus, Suh...
THE HITE JEONJU FACTORY

THE HITE JEONJU FACTORY

Renovation Production and Visitor Center Area 560.00㎡ Date 2009.7–2009.11 Location 25-33, Sinjisonggwang-ro, Yongjin-myeon, Wanju_Gun, Jeollabuk-do, Korea   Video on media wall     Project Design Eulho Suh Project Team Hwayoung Jung, Seokji Jeon   Construction Jehyo Architects Lighting Consultant Altek Motion Design Image Bakery   Graphic Design Suh Architects Photography...
ALLO & LUGH KOREA

ALLO & LUGH KOREA

New Construction Retail Area 40.00㎡ Date 2009.7–2009.10 Location 82, Yulgok-ro, Jongno-gu, Seoul, Korea     Project Design KyungEn Kim Project Team Hwayoung Jung   Furniture Design Suh Architects Furniture Manufacturer Taekyung Interior Graphic Design Suh Architects   Construction Bund 3D Rendering Suh Architects Photography Suh Architects  
LITEWORK HEADQUATERS

LITEWORK HEADQUATERS

New Construction Office Area 684.84㎡ Date 2008.9–2009.8 Location 13-11, Nonhyeon-ro 127-gil, Gangnam-gu, Seoul, Korea     Project Design Eulho Suh Project Team Jinwoo Kim, Jongho Kim, Youngsoo Kim, Doeun Lee, Jwakyum Kim, Dohyun Baek, Harim Pyo   Construction Jehyo Architecture Architect of Record Hyunin Architecture Structural Engineer DAHN Engineers & Consultant...
ALLO&LUGH CHINA

ALLO&LUGH CHINA

Interior Retail Area 46.70㎡ Date 2009.1–2009.07 Location Pudong, China     Project Design KyungEn Kim Project Team Yoonji An, Youngsoo Kim   Furniture Design Suh Architects Construction RESEN Furniture Manufacturer RESEN   Graphic Design Suh Architects, Zero to Seven Co., Graphic team 3D Rendering Suh Architects Photography Jonghwan Lee, Suh Architects...
SOMO QINGDAO PETROL EXHIBITION GALLERY

SOMO QINGDAO PETROL EXHIBITION GALLERY

New Construction Exhibition gallery, Office Area3,917.81㎡ Date2006.11–2007.08 LocationQingdao, China           Project DesignEulho Suh Project Team Jinwoo Kim, Jaeyeon Han   ConstructionSomo 3D RenderingSuh Architects   Construction DocumentsHyunin Architects